User:Doug/Kitchen renovation: Difference between revisions

From Kanthaus wiki
initial draft
 
add unisexurinal link
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
The plan to swap the main [[Kitchen]] and [[Snack kitchen]] is already underway: the recent (late 2025) window exchange put a window-door in the current kitchen, with the aim to eventually put a balcony there. This is an excellent opportunity to improve the kitchen.
This page is to plan for the future kitchen.


== Aims ==
== Aim ==
To create a kitchen that will:
To create a kitchen that will:


Line 9: Line 9:
* allow for a higher level of hygiene
* allow for a higher level of hygiene


== Scope ==
== Location ==


* k20-1-1 (currently Snack kitchen)
* Current: K20-1-2
** ''not'' the Snack kitchen cupboard
* Proposed: K20-1-1 (currently Snack kitchen) + K20-1-1B (currently Snack kitchen "Kabuff")
** 👍 has water and waste water connections
** 👍 not a pass-through room
** 👍 quite central
** 👍 would be next to the proposed future snack kitchen
** 👎 on the smaller side
*** but no passage space!
(The plan to swap Kitchen and Snack kitchen locations is already kind of underway: the recent (late 2025) window exchange put a window-door in the K20-1-2, with the aim to eventually put a balcony there.)


== Questions ==
== Plan ==


* who do we know that got a comparable kitchen renovation? How much did it cost, time did it take? Advice?
=== Preparation ===
** Lebenstraum Janishausen?
Currently some plumbing runs through the room which is in active use in the [[Main bathroom]] and lower staircase toilet.
* temporary Snack kitchen reorganization? (see below)
* sewage pipe - remove it or keep it? Removing it permanently gains a little space for the kitchen, simplifies the room shape and infrastructural complexity. Removing also requires work... Options in my order of preference
** remove pipe, relocate bathroom toilet to cupboard
*** significant work
*** move storage into the main room
*** connect sewage though the wall to the staircase toilets sewage pipe (~50 cm)
*** connect rain & tap water also from upper staircase toilet
*** since replacing toilet anyway, get one that doesn't block
** keep pipe, box it off (drywall)
*** moderate work
*** long-term missed opportunity
** remove pipe, remove bathroom toilet with no replacement
*** the toilet seems useful and used!
** keep pipe, no boxing
*** least work
*** looks ugly, dirt-trap...
*** (I would not be motivated to help with renovation if this option were chosen)
** remove pipe, reroute sewage through wall to staircase toilets
*** most work
*** this would require over 2 meters of horizontal sewage routing and a major reorganizing of pipes in upper staircase toilet
*** (I would not be motivated to help with renovation if this option were chosen)


== Plan ==
* ☐ move toilet in main bathroom K20-2-1 to "Kabuff" K20-2-1B (See Appendix) ❓
** ☐ 🧩 acquire "good" toilet (i.e. one that doesn't block, preferably with urine separation) or all-bodies-urinal (e.g. [https://finizio.de/shop/unisexurinal/ from Finizio])
** ☐ free up the left side of Kabuff
** ☐ drill necessary holes to upper-staircase toilet (~50 cm)
** ☐ water off!
** ☐ install toilet, cistern, bidet hose & connect everything up (!)
** ☐ reinstall the old door or a curtain
** ☐ remove old toilet, cap off the tube
* ☐ supply water to lower staircase toilet from upper staircase toilet (or wash kitchen)
** ☐ drill hole
** ☐ water off!
** ☐ switch connections


=== Temporary Snack kitchen reorganization ===
=== Temporary Snack kitchen ===
The Snack kitchen (i.e. k20-1-1) will be unusable for the duration of works. It is possible the work will be done in a month, but maybe longer, so the "temporary" rearrangement should be good for at least 2 months. Options:
K20-1-1 will be unusable for the duration of works. It is possible the work will be done in a month, but maybe longer, so the "temporary" rearrangement should be good for at least 2 months. Options:


* wait til weather pleasant enough, set up a a temporary outdoor "main" kitchen, set up new Snack kitchen "permanently" in current Kitchen (i.e. k20-1-2)
* if weather allows, set up a a temporary outdoor "main" kitchen and set up new Snack kitchen "permanently" in current Kitchen (i.e. k20-1-2)
** more work to begin, less at end, food preparation more distributed
** more work to begin, less at end, food preparation more distributed
* set up temporary Snack kitchen in Elephant room
* set up temporary Snack kitchen in Elephant room
Line 53: Line 50:
This phase of the work is about getting rid of unwanted things and getting the room to a stage where positive construction can begin.  
This phase of the work is about getting rid of unwanted things and getting the room to a stage where positive construction can begin.  


* remove all unmounted items
* remove mobile items (microwave, glasses, oats, etc)
* remove all mounted furniture (cupboards and shelves)
* ☐ water off!
* shut off water (both sides of the room?)
* ☐ remove mounted items (cupboards, shelf, radiator, sink, tap, etc)
* turn off power (at fusebox)
* ☐ power off!
* remove sink and tap
* remove fake-wall (left side, behind sink)
* remove fake-wall at sink
** ℹ️ unknown tasks may hide behind wall!
** unknown tasks may hide behind wall!
* remove unnecessary plumbing
* remove tiles to left of sink and to right of sink
** ☐ remove sewage pipe in back-right corner
* if removing sewage pipe (see "questions"), now
** ☐ remove water pipes leading to right side
* remove any other unnecessary plumbing
* ☐ strip walls & ceiling
* remove all hooks, plugs, clips, etc from the wall
** ☐ remove all tiles
* remove all wallpaper (including ceiling)  
** ☐ remove all wallpaper (including ceiling)
** needs to be done thoroughly, no pieces of paper left (likely requires spiky roller/water spray)
*** ℹ️ needs to be done ''thoroughly'', no pieces of paper left (likely requires spiky roller/water spray)
* remove skirting board (Fußleister)
** ☐ remove all hooks, plugs, clips, etc.
** but leave the lino
** ☐ break out any loose plaster
* prepare surfaces for painting/tiling (i.e. smooth, flat, stable)
** ☐ sand walls, if necessary
** will require filling holes
* celebrate 🎉
** may require replacing loose plaster, wall sanding and worst case a whole new layer of plaster
* celebrate! 🎉


=== Building up ===
=== Building up ===
This phase of the work is about positively constructing towards the desired end state. '''A lot of open questions still!'''
This phase of the work is about positively constructing towards the desired end state. '''A lot of open questions still!'''


* if keeping sewage pipe (see "questions"), box off
* ☐ prepare walls & ceiling (i.e. smooth, flat, stable)
* electrics
** ☐ plaster any holes
** aim to have no exposed wires
** ☐ if necessary plastering or complete dry-walling (hopefully not! 🙏)
** where to embed?
* electrics
** parapet trunking (power strip) along both sides?
** aim: no exposed wires, good number of sockets where useful
* plumbing
** ☐ main light switch
** strong-preference for wall-mounted hose-tap, otherwise under-sink connection
** ☐ ovens/stoves ❓
** inlet/outlet locations partly depend on choice of final sink unit (extra (flexible) pipe can be added)
** ☐ lights ❓
** do we keep the radiator?
** parapet trunking (power strip) along both sides
* decide how to box off "left side"
* plumbing
** half-wall or whole?
** ☐ radiator or wall heating ❓
** water outlets and sewage inlets need to be cut and included already at this point
** ☐ reroute that pipe that sticks out on the "left" side
* paint ceiling and walls
** ☐ prepare sink inlets & outlet ❓
* panel/tile walls at working areas
*** preference: [https://img1.homary.com/mall/file/2021/10/29/26e43c4043c34e81aa7b31c84b70c12a.jpg wall-mounted hose-tap]
* remove old lino, install new
*** ℹ️ outlet location has a degree of flexibility, wall-mounted tap not
* ...
* ☐ windowsill
* celebrate X 10 🎉🎉🎉🎉🎉🎉🎉🎉🎉🎉
** A nice bit or marble?
* ☐ ventilation❓
* ☐ Kabuff wall ❓
** if removing (See Appendix), shelves to go all the way
** ℹ️ [https://hardwareheaven.ie/wp/wp-content/uploads/2023/11/sb108-2.jpg "London" style shelf brackets] have a low profile.
* ☐ dry-walling left side
** aim: to be able to have one, long stainless steel work surface without any corners, gaps or cut-outs
**from floor to head-height?
* ☐ ceiling and upper walls
** white paint that can deal with humidity ❓
* ☐ lower walls
** random saved tiles, 20 cm * 20 cm ❓
* ☐ flooring
** [https://m.media-amazon.com/images/I/71Jidl6CMFL.jpg coin stud rubber matting] ❓
* portal through the wall to the snack-kitchen ❓
* ... unknown unknowns 👻💀👹 ...
* Celebrate! 🎉🎉
 
=== Installation ===
Note that the specifics of most of these items need to be decided on ''before'' commencing the work at all
 
* ☐ sink
* ☐ tap
* ☐ tables
** consider differing height requirements
* ☐ overhead storage
* ☐ fridge ❓
* CelEbRat3!!! 🎉🎉🎉🎉
 
== Appendix ==
 
=== Advice ===
Who do we know who did a comparable kitchen renovation? How much did it cost, time did it take? Advice?
* ✅ Lebenstraum Gemeinschaft Janishausen - Doug contacted
** 2026-04-21 still no response
 
=== Sewage pipe ===
Remove it or keep it? Removing it permanently gains a little space for the kitchen, simplifies the room shape and infrastructural complexity. Removing also requires work... Options in my order of preference
* remove pipe, relocate bathroom toilet to Kabuff
** significant work
* keep pipe, box it off (drywall)
** moderate work
** long-term missed opportunity
* remove pipe, remove bathroom toilet with no replacement
** the toilet seems useful and used!
* keep pipe, no boxing
** least work
** looks ugly, traps dirt
** (I would not be motivated to help with renovation if this option were chosen)
* remove pipe, reroute sewage through wall to staircase toilets
** most work
** this would require over 2 meters of horizontal sewage routing and a major reorganizing of pipes in upper staircase toilet
** (I would not be motivated to help with renovation if this option were chosen)
 
=== '''Kabuff separation wall''' ===
Remove part/all of it?
* options:
** removing the "small" side towards the entrance would allow a/the shelf to extend all the way to the door, making better use of the space
** as above, but extending all the way up: would allow a/the shelf to extend vertically to roof
** all: unclear... my imagination overflows
* any removal would brings ''significant'' costs and would only make sense to do during main action
** would require architectural considerations, possibly building in supports
** dusty breakage
** significant plastering required
** permanent damage to original and pretty door-frame
** makes it necessary to make all shelving new
* To-do: drill into wall above door frame post: if it extends to the ceiling, it's probably supporting
 
=== Heating (or not) ===
Options and their drawbacks
 
* Keep radiator (status quo)
** takes space from room
** makes windowsill less accessible
** traps dirt
** increases wall complexity for tiling, etc
* Remove radiator, no replacement
** possibly too cold in winter
*** but likely fine given physical activity + heating from cooking
* Remove radiator, install wall-heating panel
** work: finding parts, mounting, plumbing and plastering

Latest revision as of 16:33, 21 April 2026

This page is to plan for the future kitchen.

Aim

To create a kitchen that will:

  • enable preparing food for bigger numbers of people
  • be more enjoyable to use
  • be easier to clean and maintain
  • allow for a higher level of hygiene

Location

  • Current: K20-1-2
  • Proposed: K20-1-1 (currently Snack kitchen) + K20-1-1B (currently Snack kitchen "Kabuff")
    • 👍 has water and waste water connections
    • 👍 not a pass-through room
    • 👍 quite central
    • 👍 would be next to the proposed future snack kitchen
    • 👎 on the smaller side
      • but no passage space!

(The plan to swap Kitchen and Snack kitchen locations is already kind of underway: the recent (late 2025) window exchange put a window-door in the K20-1-2, with the aim to eventually put a balcony there.)

Plan

Preparation

Currently some plumbing runs through the room which is in active use in the Main bathroom and lower staircase toilet.

  • ☐ move toilet in main bathroom K20-2-1 to "Kabuff" K20-2-1B (See Appendix) ❓
    • ☐ 🧩 acquire "good" toilet (i.e. one that doesn't block, preferably with urine separation) or all-bodies-urinal (e.g. from Finizio)
    • ☐ free up the left side of Kabuff
    • ☐ drill necessary holes to upper-staircase toilet (~50 cm)
    • ☐ water off!
    • ☐ install toilet, cistern, bidet hose & connect everything up (!)
    • ☐ reinstall the old door or a curtain
    • ☐ remove old toilet, cap off the tube
  • ☐ supply water to lower staircase toilet from upper staircase toilet (or wash kitchen)
    • ☐ drill hole
    • ☐ water off!
    • ☐ switch connections

Temporary Snack kitchen ❓

K20-1-1 will be unusable for the duration of works. It is possible the work will be done in a month, but maybe longer, so the "temporary" rearrangement should be good for at least 2 months. Options:

  • if weather allows, set up a a temporary outdoor "main" kitchen and set up new Snack kitchen "permanently" in current Kitchen (i.e. k20-1-2)
    • more work to begin, less at end, food preparation more distributed
  • set up temporary Snack kitchen in Elephant room
    • less work to begin, more at end, food preparation more concentrated

Stripping down

This phase of the work is about getting rid of unwanted things and getting the room to a stage where positive construction can begin.

  • ☐ remove mobile items (microwave, glasses, oats, etc)
  • ☐ water off!
  • ☐ remove mounted items (cupboards, shelf, radiator, sink, tap, etc)
  • ☐ power off!
  • ☐ remove fake-wall (left side, behind sink)
    • ℹ️ unknown tasks may hide behind wall!
  • ☐ remove unnecessary plumbing
    • ☐ remove sewage pipe in back-right corner
    • ☐ remove water pipes leading to right side
  • ☐ strip walls & ceiling
    • ☐ remove all tiles
    • ☐ remove all wallpaper (including ceiling)
      • ℹ️ needs to be done thoroughly, no pieces of paper left (likely requires spiky roller/water spray)
    • ☐ remove all hooks, plugs, clips, etc.
    • ☐ break out any loose plaster
    • ☐ sand walls, if necessary
  • celebrate 🎉

Building up

This phase of the work is about positively constructing towards the desired end state. A lot of open questions still!

  • ☐ prepare walls & ceiling (i.e. smooth, flat, stable)
    • ☐ plaster any holes
    • ☐ if necessary plastering or complete dry-walling (hopefully not! 🙏)
  • ☐ electrics
    • aim: no exposed wires, good number of sockets where useful
    • ☐ main light switch
    • ☐ ovens/stoves ❓
    • ☐ lights ❓
    • ☐ parapet trunking (power strip) along both sides ❓
  • ☐ plumbing
    • ☐ radiator or wall heating ❓
    • ☐ reroute that pipe that sticks out on the "left" side
    • ☐ prepare sink inlets & outlet ❓
      • preference: wall-mounted hose-tap
      • ℹ️ outlet location has a degree of flexibility, wall-mounted tap not
  • ☐ windowsill
    • A nice bit or marble?
  • ☐ ventilation❓
  • ☐ Kabuff wall ❓
  • ☐ dry-walling left side
    • aim: to be able to have one, long stainless steel work surface without any corners, gaps or cut-outs
    • from floor to head-height?
  • ☐ ceiling and upper walls
    • white paint that can deal with humidity ❓
  • ☐ lower walls
    • random saved tiles, 20 cm * 20 cm ❓
  • ☐ flooring
  • portal through the wall to the snack-kitchen ❓
  • ... unknown unknowns 👻💀👹 ...
  • Celebrate! 🎉🎉

Installation

Note that the specifics of most of these items need to be decided on before commencing the work at all

  • ☐ sink
  • ☐ tap
  • ☐ tables
    • consider differing height requirements
  • ☐ overhead storage
  • ☐ fridge ❓
  • CelEbRat3!!! 🎉🎉🎉🎉

Appendix

Advice

Who do we know who did a comparable kitchen renovation? How much did it cost, time did it take? Advice?

  • ✅ Lebenstraum Gemeinschaft Janishausen - Doug contacted
    • 2026-04-21 still no response

Sewage pipe

Remove it or keep it? Removing it permanently gains a little space for the kitchen, simplifies the room shape and infrastructural complexity. Removing also requires work... Options in my order of preference

  • remove pipe, relocate bathroom toilet to Kabuff
    • significant work
  • keep pipe, box it off (drywall)
    • moderate work
    • long-term missed opportunity
  • remove pipe, remove bathroom toilet with no replacement
    • the toilet seems useful and used!
  • keep pipe, no boxing
    • least work
    • looks ugly, traps dirt
    • (I would not be motivated to help with renovation if this option were chosen)
  • remove pipe, reroute sewage through wall to staircase toilets
    • most work
    • this would require over 2 meters of horizontal sewage routing and a major reorganizing of pipes in upper staircase toilet
    • (I would not be motivated to help with renovation if this option were chosen)

Kabuff separation wall

Remove part/all of it?

  • options:
    • removing the "small" side towards the entrance would allow a/the shelf to extend all the way to the door, making better use of the space
    • as above, but extending all the way up: would allow a/the shelf to extend vertically to roof
    • all: unclear... my imagination overflows
  • any removal would brings significant costs and would only make sense to do during main action
    • would require architectural considerations, possibly building in supports
    • dusty breakage
    • significant plastering required
    • permanent damage to original and pretty door-frame
    • makes it necessary to make all shelving new
  • To-do: drill into wall above door frame post: if it extends to the ceiling, it's probably supporting

Heating (or not)

Options and their drawbacks

  • Keep radiator (status quo)
    • takes space from room
    • makes windowsill less accessible
    • traps dirt
    • increases wall complexity for tiling, etc
  • Remove radiator, no replacement
    • possibly too cold in winter
      • but likely fine given physical activity + heating from cooking
  • Remove radiator, install wall-heating panel
    • work: finding parts, mounting, plumbing and plastering